Building permit 1st signature

Krishna obtained the first formal signature for the building permit yesterday. For that he had to go to the local office of the VDC, an hour's walk from the school.

A line waiting with all kinds of paperwork was ahead of him.

Next step is the signature at the VDC headquarters, 3 hours walk.

Local VDC office Sailung
1st signature building application
paperwork

3 hours to the Internet

Before all the paperwork was collected, Krishna had to go to a high speed internet to download drawings and data. Nearest location is in Maga Deurali , near Mude, 3 hours walk. The weather was not very good, rain. But you know that during the rainy season.

Luckily on the way back Krishna managed to get a lift. 

Magadaurali Internet
water on the road
building permit downloads

Share this news item

en_US