Thanks to the new access road to the school site, trucks can reach the construction site. That will save a lot of lugging. The bulldozer could also be used for 2 more days to collect stones for the protection wall and dig the large foundation holes.
To keep up with all this, the permanent construction team of 7 men was temporarily reinforced by 13 local men to a team of 20 men in total.
![foundation holes](https://www.sailung.nl/wp-content/uploads/2020/10/20201009-foundation-holes-small-side-575x1024.jpg)
![holes along the wall](https://www.sailung.nl/wp-content/uploads/2020/10/20201017-overview-foundation-holes-and-wall-1024x768.jpg)
Holes almost 2 meters deep
![](https://www.sailung.nl/wp-content/uploads/2020/10/20201022-base-foundation-hole-4.jpg)
![](https://www.sailung.nl/wp-content/uploads/2020/10/20201023-remove-big-stone-1024x575.jpg)
![](https://www.sailung.nl/wp-content/uploads/2020/10/20201023-foundation-hole-with-concrete-4.jpg)